| Offering information: | Not offered until 2015 |
|---|---|
| Offered at: | (G, X) |
| Credit point(s): | 1 |
| Offerings: | Trimester 1 |
| EFTSL value: | 0.125 |
| Unit chair: | H Trinh |
| Prerequisite: | SEE308 and one of SEE434 or SEE344 |
| Contact hours: | 1 x 1 hour lecture per week, 2 hours laboratory and project work per week. Compulsory on campus attendance requirement for all students either at scheduled sessions on multiple days during the trimester or on a single scheduled day during Week 9. Typically on-campus (G) enrolled students will attend the compulsory activities for this unit at scheduled sessions on multiple days during the trimester and off-campus (X) enrolled students will attend the compulsory activities for this unit on a single scheduled day during Week 9. |
| Note: Online teaching methods require internet access. Please refer to the most current computer specifications. | |
Content
This unit covers electrical power system modelling, dynamics of various generator-motor-load, transfer functions, power system stability, voltage and load frequency control, load flow analysis using various types of load flow, balanced and unbalanced fault calculations, safety standards in use in the electrical industry, both in Australia and aboard.
Assessment
Assignment work 60%, examination 40%. To be eligible to obtain a pass in this unit, students must achieve an overall mark of at least 40% in the examination and compulsory attendance is required by all students to unit-specific activities at the Geelong Waurn Ponds Campus. These unit-specific activities may be undertaken either at scheduled sessions on multiple days during the trimester or during a single day of unit-specific activities scheduled during Week 9.
Unit Fee Information