SEV455 - Water System Design

Unit details

Year2016 unit information
Enrolment modes:Trimester 1: Waurn Ponds (Geelong), Cloud (online)
Credit point(s):1
EFTSL value:0.125
Unit chair:

Nick Milne

Prerequisite:

SEV328 and one unit in SEV222 or SEV322

Corequisite:

Nil

Incompatible with:

SEV301

Contact hours:

Campus: 1 x 2 hour class per week, 1 x 2 hour seminar per week. Students must attend and participate in compulsory activities for this unit at scheduled sessions on multiple days during the trimester.

Cloud (online): Learning experiences are via CloudDeakin . Students must attend and participate in mandatory activities at the Geelong Waurn Ponds Campus on the particular scheduled day during the trimester intensive week.

Content

This unit will cover the design aspects of a water and waste water treatment plants, as well as water distribution and collection systems. Thus, this unit will provide knowledge to understand the design and skills to manage most of the water operations in an urban or peri-urban context.

Assessment

Preliminary design plan 10%, final design report 30%, evaluation of a water system report 30%, integrated urban water design report 30%. To be eligible to obtain a pass in this unit compulsory attendance is required by all students to unit-specific activities at Waurn Ponds (Geelong). These unit-specific activities may be undertaken either at scheduled sessions on multiple days during the trimester or during a single day of unit-specific activities scheduled during the trimester intensive week.