Dr Atabak Elmi

STAFF PROFILE

Position

Lecturer, IT Industry Projects

Faculty

Faculty of Sci Eng & Built Env

Department

School of Info Technology

Campus

Geelong Waurn Ponds Campus

Contact

atabak.elmi@deakin.edu.au
+61 3 924 68109

Publications

Filter by

2020

An Ant Colony Optimisation Based Heuristic for Mixed-model Assembly Line Balancing with Setups

Dhananjay Thiruvady, Asef Nazari, Atabak Elmi

(2020), pp. 1-8, CEC 2020 : Proceedings from the IEEE Congress on Evolutionary Computation, Online from Glasgow, Scotland, E1

conference
2017

Cyclic job shop robotic cell scheduling problem: ant colony optimization

A Elmi, S Topaloglu

(2017), Vol. 111, pp. 417-432, Computers and industrial engineering, Amsterdam, The Netherlands, C1-1

journal article

Combinatorial Benders cuts for assembly line balancing problems with setups

S Akpinar, A Elmi, T Bekta?

(2017), Vol. 259, pp. 527-537, European journal of operational research, Amsterdam, The Netherlands, C1-1

journal article

Multi-degree cyclic flow shop robotic cell scheduling problem with multiple robots

A Elmi, S Topaloglu

(2017), Vol. 30, pp. 805-821, International journal of computer integrated manufacturing, Abingdon, Eng., C1-1

journal article
2016

Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization

A Elmi, S Topaloglu

(2016), Vol. 73, pp. 67-83, Computers and operations research, Amsterdam, The Netherlands, C1-1

journal article
2014

Scheduling multiple parts in hybrid flow shop robotic cells served by a single robot

A Elmi, S Topaloglu

(2014), Vol. 27, pp. 1144-1159, International journal of computer integrated manufacturing, Abingdon, Eng., C1-1

journal article
2013

A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots

A Elmi, S Topaloglu

(2013), Vol. 40, pp. 2543-2555, Computers and operations research, Amsterdam, The Netherlands, C1-1

journal article

A tabu search approach for cell scheduling problem with makespan criterion

M Solimanpur, A Elmi

(2013), Vol. 141, pp. 639-645, International journal of production economics, Amsterdam, The Netherlands, C1-1

journal article
2011

A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts

A Elmi, M Solimanpur, S Topaloglu, A Elmi

(2011), Vol. 61, pp. 171-178, Computers and Industrial Engineering, C1

journal article

A tabu search approach for group scheduling in buffer-constrained flow shop cells

M Solimanpur, A Elmi

(2011), Vol. 24, pp. 257-268, International Journal of Computer Integrated Manufacturing, C1

journal article

Funded Projects at Deakin

No Funded Projects at Deakin found

Supervisions

No completed student supervisions to report