SRQ462 - Building Cost Planning

Unit details

Note: You are seeing the 2013 view of this unit information. These details may no longer be current.
Enrolment modes:

(S, X)

Credit point(s):1
EFTSL value: 0.125
Unit chair:

E Chan

Prerequisite:

SRT351, SRE272 (students enrolled in S346, D364, D365)

Corequisite:

Nil

Incompatible with:

Nil

Contact hours:

Trimester 2: 1 x 2 hour lecture, 1 x 1 hour tutorial per week

Note:

*The trimester 3 offering will be via off campus mode. Students will need access to a computer and modem connection (of a minimum standard specified by the University).

Content

This unit considers the principles of design economics applied to buildings and the role of cost planning during design development. Topics include the origins and purpose of cost planning and control, various techniques for estimating prices based on area, function, element, sub-element and composite work items, the effect of design constraints and variables on total building costs, the stages of design development, adjustment of historical prices and the accuracy of different estimating approaches. Life cycle costing, including the use of discounting in comparative situations, and its importance in the assessment of environmental sustainability are discussed in detail.

Assessment

Two assignments (30% each) 60%, examination 40%.  To be eligible to obtain a pass in this unit students must achieve at least 40% in the examination

Unit Fee Information

Student Contribution Rate*Student Contribution Rate**Fee rate - Domestic Students Fee rate - International students
$1045$1045$2866$2955

* Rate for all CSP students, except for those who commenced Education and Nursing units pre 2010
** Rate for CSP students who commenced Education and Nursing units pre 2010
Please note: Unit fees listed do not apply to Deakin Prime students.