Unit search

Search results

SEN725 - Urban Stormwater Asset Design

Year:

2021 unit information

Important Update:

Unit delivery will continue to be provided in line with the most current COVIDSafe health guidelines. This may include a mix of on-campus and online activities. To find out how you are impacted, please check your unit sites for announcements and updates. Unit sites open one week prior to the start of each Trimester/Semester.

Thank you for your flexibility and commitment to studying with Deakin in 2021.

Last updated: 4 June 2021

Enrolment modes:Trimester 2: Waurn Ponds (Geelong), Online
Credit point(s):1
EFTSL value:0.125
Unit Chair:Trimester 2: Lloyd Chua
Prerequisite:

Nil

For S460 students: completion of 22 credits points

Corequisite:

Nil

Incompatible with:

Nil

Typical study commitment:

Students will on average spend 150 hours over the teaching period undertaking the teaching, learning and assessment activities for this unit.

Scheduled learning activities - campus:

1 x 1 hour online content per week (recordings provided), 1 x 1 hour seminar per week, 1 x 2 hour workshop per week.

Scheduled learning activities - cloud:

1 x 1 hour online content per week (recordings provided), 1 x 2 hour online workshop per week.

Content

This unit provides students with an overview of urban storm water management and road drainage design. Both quantity and quality aspects will be covered. The Unit comprises theoretical coverage of the rainfall-runoff and water quality transformation concepts in the context of an urban environment and modelling applications. Students will be taught the mathematical formulations for overland and channel flow, hydrological concepts to derive runoff and the application of these concepts in modelling. Empirical formulations for modelling water quality transformation process will be introduced and adopted for the modelling of water quality in urban runoff with emphasis on conservative transport. Students will be required to demonstrate their understanding through tests and project works

ULO These are the Learning Outcomes (ULO) for this unit. At the completion of this unit, successful students can: Deakin Graduate Learning Outcomes
ULO1

Demonstrate the attainment of knowledge and concepts related to urban stormwater management.

GLO1: Discipline-specific knowledge and capabilities

ULO2

Comprehend and apply physical concepts and mathematical principles to derive engineering solutions for quantity and quality management.

GLO1: Discipline-specific knowledge and capabilities

ULO3

Apply engineering principles and advanced technical knowledge to design and conceptualize the application of these skills to real world problems.

GLO1: Discipline-specific knowledge and capabilities
GLO4: Critical thinking
GLO5: Problem solving

ULO4

Apply innovativeproblem-solving and research principles in the development of modelling to practical applications of urban stormwater management.

GLO1: Discipline-specific knowledge and capabilities
GLO3: Digital literacy

ULO5

Communicate with the engineering community in the investigation of problems in urban stormwater management.

GLO2: Communication

These Unit Learning Outcomes are applicable for all teaching periods throughout the year

Assessment

Assessment Description Student output Grading and weighting
(% total mark for unit)
Indicative due week
Preliminary project report and oral defence Written report, approximately 2,000 words, and voice-over PowerPoint of 5-7 minutes 30% (15%, 15%) Week 6
Tests 2 x online tests 20% (2 x 10%) Week 5 and Week 9
Final project report Written technical report, 4,000-word maximum 50% Week 12

The assessment due weeks provided may change. The Unit Chair will clarify the exact assessment requirements, including the due date, at the start of the teaching period.

Learning Resource

There is no prescribed text. Unit materials are provided via the unit site. This includes unit topic readings and references to further information.

Unit Fee Information

Click on the fee link below which describes you: